Proof of performance

Featured Projects

Work you can verify, not a wall of logos. Highways, municipal trails, and commercial corridors across South Carolina.

Excavator on Highway shoulder beside erosion control
Kershaw County, SCIn progress

$800,000+ delivered in 9 months

Highway 601 over Colonel's Creek / Mountain Creek

A major infrastructure improvement contract demanding continuous equipment uptime, strict environmental sediment management near Colonel's Creek, and coordination with SCDOT inspectors.

Scope items:

  • •Site clearing & grubbing across extensive right-of-way
  • •Subgrade establishment & stabilization
  • •Borrow hauling and high-volume placement
  • •Riprap placement along bridge abutments and creeks
  • •DOT bridge tie-ins
Storm drain concrete pipes on Highway 378
Sumter / Kershaw County, SCIn progress

5,200 LF of storm drain on Hwy 378

Highway 601 / 378 Overpass

High-volume storm drainage installation requiring trench safety shoring, precision laser slope verification, and massive material supply from our permitted borrow pits.

Scope items:

  • •5,200 linear feet of storm drain installed along Highway 378
  • •Precast concrete junction boxes and headwalls
  • •Secured dirt pit permit for borrow material
  • •Supplied 90,000 cubic yards of borrow to SCDOT
Reestablished rail bed trail
Great Falls, SCComplete

$368,000+ project

Great Falls Rail Trail

Completed January 1, 2026. Transformed abandoned rail right-of-way into a stable, well-drained recreational corridor with reinforced crossline drainage pipes.

Scope items:

  • •Site clearing and vegetation stripping
  • •Reestablishment of historic rail bed grading
  • •Repair and replacement of damaged storm crosslines
  • •Delivered as joint venture with United Infrastructure